BJC HealthCare Memorial Hospital East Siteman Cancer Center
IMPACT Strategies managed the pre-construction design phase and the construction of the BJC HealthCare Siteman Cancer Center at Memorial Hospital East in Shiloh, IL.
The new cancer treatment facility is a 3-story, steel building with a brick and cast stone façade. The first level of the new building includes 2 reinforced concrete vaults for Siteman’s LINAC (linear accelerators). It also houses labs, a pharmacy, medical oncology infusion clinics, and radiation oncology clinics. The second and third story have been prepped with spaces for future tenants.
This new building is connected to an active medical office building in which IMPACT has completed the finish work for both a pediatric practice and an imaging center.
Client:
BJC HealthCare
Square Footage:
70,000